§ 13.12.0411. Schedule GD-03—General service demand time of use rate.  


Latest version.
  • A.

    Applicability. This schedule applies to all not covered by other rate schedules with the following types of service:

    1.

    120/208 or 120/240 volts, single or three phase, service panel larger than 400 amps.

    2.

    240/480 or 277/480 volts, three phase service panel larger than 200 amps.

    B.

    Character of service. Sixty cycle, alternating current at such phase and voltage as the City may have available will be furnished under this schedule, applied through a single meter and one point of delivery.

    C.

    Time of use rate effective January 1, 2018:

    1.

    Base charge:

    a.

    Single phase $54.34 per month.

    b.

    Three phase $135.91 per month.

    2.

    Energy use charge between June 1 and August 31, shall be $0.0767 per kWh during heavy load hours, $0.0767 per kWh during medium load hours, and $0.0.286 per kWh during light load hours.

    3.

    Energy usage charge between September 1 and May 31, shall be $0.0846 per kWh during heavy load hours, $0.0846 per kWh during medium load hours, and $0.0259 per kWh during light load hours.

    4.

    Billing demand:

    a.

    Billing demand for each month shall be based on the maximum hour of kVA (apparent power) during heavy and medium load hours.

    b.

    Demand usage charge: $4.62 per kVA.

(Ord. 3601 § 1, 12/19/2017; Ord. 3539 § 1, 9/1/2015; Ord. 3513 § 1, 10/7/2014; Ord. 3489 § 1, 11/5/2013; Ord. 3464 § 1, 10/16/2012, eff. 1/7/2013; Ord. 3452 § 1, 4/17/2012)