§ 14.05.050. Electrical permit applications.  


Latest version.
  • A.

    Applications for electrical permit shall be filled out completely and delivered to the Office of the Electrical Inspector before a permit will be issued.

    B.

    For industrial, commercial, and residential projects larger than a duplex, a one-line drawing of the electrical service and feeders, building size (square feet), load calculations, and the type and size of conductors and/or raceway is required and shall accompany the electrical permit application.

    C.

    Every electrical permit issued by the Inspector under the provisions of this chapter shall expire by limitation and become null and void if the work authorized by such permit is not commenced within 60 days from the date of issuance of the permit, or if the work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of six months. In such circumstances another permit is required before work may (re)commence.

    D.

    An address shall be provided for the location of the electrical work (street intersections are not acceptable).

    E.

    WAC 296-46B-900 requires electrical plan review for certain specified facilities. When electric plan review is required by WAC 296-46B-900 or other authority, full engineering drawings and reports in both hard copy and electronic (pdf) version shall accompany the electrical permit application.

(Ord. 3499, § 2, 3/18/2014; Ord. 3154 § 1 (part), 1/30/2004; Ord. 2966 § 1 (part) 8/29/1997; Ord. 2552 § 3, 10/25/1989)