§ 17.31.220. Modifications after final approval.


Latest version.
  • The final approval shall be binding upon the development. Design variations from the plan must be submitted to the Department of Community and Economic Development and Hearing Examiner for approval and amendment of the permit, except for minor changes, as follows: The DCED is authorized to allow minor adjustments in the development schedule, location, placement, height or dimension of buildings and structures, not to exceed an alteration of ten percent in height or ten feet in any other direction, when such minor changes and alterations are required by engineering and other circumstances not foreseen or reasonably foreseeable at the time of approval of the final development plans; except that such adjustments shall not increase the total amount of floor space authorized in the approved PID, the number of dwelling units or density, decrease the amount of parking or loading facilities, permit buildings to locate closer to the closest boundary line, decrease the amount of open space, or environmentally sensitive areas, decrease the recreation facilities, change any points of ingress or egress to the site, or extend the development schedule for not more than 12 months.

(Ord. 3548 § 17, 1/5/2016; Ord. 3272, 2/16/2007; Ord. 3180 § 1 (part), 12/17/2004)